Grundfos TPE3 32-120 S-A-F-A-BQQE Dry-running pump 0.25 kW 99272203 P26/3
- A few left in stock!
Grundfos TPE3 32-120 S-A-F-A-BQQE Dry-running pump
General Information
- Product name: TPE3 32-120 S-A-F-A-BQQE
- Product number: 99272203
- EAN number: 5713826359973
Pump Data
- Pump speed: 3600 rpm
- Rated flow: 10.9 m3 per hour
- Rated head: 6.2 meters
- Maximum head: 12 meters
- Actual impeller diameter: 62 mm
- Mechanical seal: BQQE
- ISO acceptance class: ISO9906 2012 3B2
- Pump version: A
Materials
- Material code: A
- Pump housing: Cast iron
- Pump casing: EN-GJL-250
- Pump housing ASTM: Class 35
- Impeller material: Composite
- Impeller: PES plus 30 percent GF
- Type key material: A
Installation
- Ambient temperature: minus 20 to 50 degrees Celsius
- Maximum operating pressure: 10 bar
- Maximum pressure at given temperature: 10 bar at 120 degrees Celsius
- Connection type code: F DIN Flange
- Pipe connection standard: EN 1092-2
- Connection type: DIN
- Connection size: DN 32
- Nominal pressure rating: PN 6 10
- Installation length: 220 mm
- Motor flange size: 56C
Pumped liquid
- Pumped liquid: Water
- Liquid temperature range: minus 25 to 120 degrees Celsius
- Liquid temperature at data acquisition: 20 degrees Celsius
- Density: 998.2 kg per m3
Electrical Data
- Motor design: 71A
- Motor rated power P2: 0.25 kW
- Mains frequency: 50 60 Hz
- Rated voltage: 3 x 380 to 500 Volts
- Rated current: 0.9 to 0.75 A
- Power factor Cos phi: 0.58 to 0.5
- Rated speed: 360 to 4000 rpm
- IE efficiency class: IE5
- Motor efficiency at full load: 81.2 percent
- Motor poles: 0
- Protection class: IP55
- Thermal class: F
Please refer to the data sheet for all further information.
- Condition: new (top condition)
- Our item number: P26/3
Couldn't load pickup availability
Further information
- Manufacturer: Grundfos
- Installation length: 220 mm
- Condition: new
- Pipe connection: DN 32
Secure shopping
All electrical equipment has undergone a VDE safety inspection.
Delivery & Shipping
- Austria: 1-2 working days
- Germany: 2–3 working days
- Europe-wide: 3–5 working days
Note:
For freight forwarding goods from 40 kg, the delivery time is 3–5 working days.















