Kemper full flow shut-off valve DC 24 V DN 15 spring return actuator K18/20
- A few left in stock!
We offer you a day and night emergency hotline. You can reach us 24/7, including Sundays and holidays, at this number. You'll find the phone number at the top of the webshop!
Pumps - Sanitary - Electrical - Specialist Retailer
KEMPER KHS VAV-PLUSFULL-FLOW SHUT-OFF VALVE
- WITH SPRING RETURN ACTUATOR
- DC 24 V
- DIN-DVGW approval
- DN 15
- RG 5
- PN 16
- 5 VA
- 7 Nm
- up to 90 °C
- electrical shut-off device combinable with flushing system
- extremely low pressure loss
- media-contacting metal parts made of stainless steel and red brass
- actuator with spring return as 2-point control and reset in case of power failure
- 90° rotatable
- pressure surge-free operation
- easy maintenance in installed state
- maintenance-free gearbox
- for connection to KHS LOGIC system control or building management system (BMS)
- with self-centering shaft adapter and fixed flange for mounting on the valve
- external thread for flat-sealing screw connections
- removable inner top part TOP-ENTRY, with EPDM sealing body and stainless steel closing body
- dead-space free
- Condition: The valve is used and in top condition.
- Order number: K18/20
You will receive an invoice with deductible VAT.
Upon confirmation of your purchase, you will automatically receive our bank details. If you order from another EU country, we will send you the details for international payments.
If you order from other countries, not from Germany, we send you our international bank account with IBAN and SWIFT.
Our specialized staff is always available to answer any questions you may have.
Couldn't load pickup availability
Further information
- Manufacturer:
- Installation length:
- Condition: used
- Pipe connection:
Secure shopping
All electrical equipment has undergone a VDE safety inspection.
Delivery & Shipping
- Austria: 1-2 working days
- Germany: 2–3 working days
- Europe-wide: 3–5 working days
Note:
For freight forwarding goods from 40 kg, the delivery time is 3–5 working days.




