Pump Control CU 3 V06 626186 + Current Transformer 62.04.98 No. 62500257 S16/150
- A few left in stock!
We offer you a day and night hotline for emergencies. You can reach us 24/7 at this number, including Sundays and public holidays. You can find the phone number at the top of the webshop!
Pumps - Sanitary - Electrical - Specialist Retailer
Pump Control CU 3 V06 626186 + Current Transformer 62.04.98 No. 62500257 S16/150
- Pumpenkost Order No.: S16/150
In addition to the statutory warranty of 2 years, we extend the warranty by another year, making a total of 3 years.
The unit monitors pumps or motors. It reacts to ground fault, motor temperature, overload, undervoltage and overvoltage
- Unbalanced currents, rotating field
- Control Unit
- Prod.nr. 62.61 86 V06
- 3x400 VAC 50/60 Hz
- Pmax: 20W
- Temperature: -20 to 60°C
- IP20
Signal converter - Signalconverter - Signal converter - Current transformer
Prod. No. 62.04.98
- AMP 10-120
- 50/60 Hz
- 100/0.1 A
- 0.02 VA
- CL 1
- 0.8/3 KV
Condition: The control unit and the signal converter are as good as new and have never been installed.
- Our item number: S16/150
Our specialist staff is always available for questions:
- Pumpenkost GmbH
- eMail: office@pumpenkost.com
- Central telephone number: 0043 676 42202090043 5354 88399
You will receive an invoice with deductible VAT.
With your purchase confirmation, you will automatically receive our bank details. If you order from another EU country, we will send you the data for international payments.
If you order from other countries, not from Germany, we send you our international bank account with IBAN and SWIFT.
Please do not hesitate to contact us if you have any questions.
Couldn't load pickup availability
Further information
- Manufacturer:
- Installation length:
- Condition:
- Pipe connection:
Secure shopping
All electrical equipment has undergone a VDE safety inspection.
Delivery & Shipping
- Austria: 1-2 working days
- Germany: 2–3 working days
- Europe-wide: 3–5 working days
Note:
For freight forwarding goods from 40 kg, the delivery time is 3–5 working days.




